Skip to content

GreenLeaf Cultivation — Water Treatment Upgrade

GreenLeaf Cultivation

2025

GreenLeaf Cultivation was struggling with inconsistent water quality across their multi-room facility. Their existing filtration setup could not keep up with demand.

We designed a complete R.O. water treatment overhaul with redundant filtration stages, automated backwash cycles, and real-time TDS monitoring.

About This Project

GreenLeaf Cultivation was struggling with inconsistent water quality across their multi-room facility. Their existing filtration setup could not keep up with demand.

We designed a complete R.O. water treatment overhaul with redundant filtration stages, automated backwash cycles, and real-time TDS monitoring.

Project Gallery

Project Details

Client

GreenLeaf Cultivation

Year

2025

Category

Website

More Projects

Ready to Build Your Irrigation System?

Custom CAD design. Procurement. Installation. Consulting. Start with what you need.

Current projects on Instagram @plumbdawg_millionaire

Important Disclaimer: The irrigation design services provided by Plumbdawg Design produce process piping drawings, not engineered drawings. These drawings are intended for layout and planning purposes. Any engineering certifications, stamps, or compliance reviews required by local authorities must be obtained separately from a licensed professional engineer.

Start Your Project (503) 732-0324